logo

Standards Manage Your Business

We Manage Your Standards

ASME

BPVC XI.1 : 2025

Rules for Inservice Inspection of Nuclear Reactor Facility Components Division 1 Rules for Inservice Inspection of Nuclear Power Plant Components

Standard Details

Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied. DIVISION 1 This Division provides rules for the examination, inspection, and testing; NDE methods, qualifications, and requirements; evaluation and acceptance standards for flaws, defects, and relevant conditions; repair/replacement processes and correction actions/measures in light water cooled nuclear power plants. Careful application of this Section will help users to comply with applicable regulations within their jurisdictions, while achieving the operational, cost and safety benefits to be gained from the many industry best-practices detailed within these volumes.

General Information

Status : ACTIVE
Standard Type: Main
Document No: BPVC XI.1 : 2025
Document Year: 2025

Life Cycle

Currently Viewing

ACTIVE
BPVC XI.1 : 2025
Knowledge Corner

Expand Your Knowledge and Unlock Your Learning Potential - Your One-Stop Source for Information!

© Copyright 2025 BSB Edge Private Limited.

Enquire now +