logo

Standards Manage Your Business

We Manage Your Standards

SAE

SAE J2847/2_202309 : 2023

Communication Between Plug-in Vehicles and Off-Board DC Chargers

Standard Details

This SAE Recommended Practice establishes requirements and specifications for communication between plug-in electric vehicle (PEV) and the DC off-board charger. Where relevant, this document notes, but does not formally specify, interactions between the vehicle and vehicle operator.

This document applies to the off-board DC charger for conductive charging, which supplies DC current to the rechargable energy storage system (RESS) of the electric vehicle through a SAE J1772 coupler. Communications will be on the SAE J1772 pilot line for PLC communication. The details of powerline communications (PLC) are found in SAE J2931/4.

This document supports DC energy transfer via forward power flow (FPF) from source to vehicle.

SAE has published multiple documents relating to PEV and vehicle-to-grid interfaces. The various document series are listed below, with a brief explanation of each.

Figure 1 shows the sequencing of these documents and their primary function (e.g., the SAE J2836 and SAE J2847/1 documents start with smart charging, SAE J2836 and SAE J2847/2 then adds DC charging, etc.). The intent is to have subsequent slash sheets complement each other as more functions and features are included. The /6 series of documents add wireless charging items not already included in the proceeding slash sheets. These are all then included in interoperability in SAE J2953 and security in SAE J2931/7. SAE J3072 then includes the PEV to grid requirements for vehicle-to-grid (V2G) power and communication to match SAE J2836/3 use cases.

The summary of documents for DC charging is then as follows:

- SAE J1772 is the PEV to EVSE systems document and includes the system and timing diagrams for DC charging.

- SAE J2836/2 starts with the use cases for DC charging communications.

- SAE J2847/2 then transforms these use case requirements into the signals and messages.

- SAE J2931/1 is where the protocol requirements are placed for all PEV communications.

- SAE J2931/4 is used for the PLC communication requirements for DC charging since it is only a wired median.

- SAE J2953/1 is the interoperability requirements.

- SAE J2953/2 is the interoperability procedure and plan.

- SAE J2931/7 includes the security.

General Information

Status : Revised
Standard Type: Main
Document No: SAE J2847/2_202309 : 2023
Document Year: 2023
Pages: 231

Life Cycle

Currently Viewing

Revised
SAE J2847/2_202309 : 2023
Knowledge Corner

Expand Your Knowledge and Unlock Your Learning Potential - Your One-Stop Source for Information!

© Copyright 2024 BSB Edge Private Limited.

Enquire now +