Knowledge Gateway
Unlock your learning potential with industry insights and standards that matter. Share your email to begin.
Unlock your learning potential with industry insights and standards that matter. Share your email to begin.
Status : Active
Standard Type : Main
Document No : ISO 23469:2005
Document Year : 2005
Pages : 85
Edition : 1
Section Volume : Loads, forces and other actions (ISO/TC 98/SC 3.)
ISO 23469:2005 provides guidelines for specifying seismic actions for designing geotechnical works, including buried structures (e.g. buried tunnels, box culverts, pipelines, and underground storage facilities), foundations (e.g. shallow and deep foundations, and underground diaphragm walls), retaining walls (e.g. soil retaining and quay walls), pile-supported wharves and piers, earth structures (e.g. earth and rockfill dams and embankments), gravity dams, landfill and waste sites.
The guidelines provided in ISO 23469:2005 are general enough to be applicable for both new and existing geotechnical works. However, for use in practice, procedures more specific to existing geotechnical works can be needed, such as those described for existing structures in ISO 13822.